What is the schedule and frequency of the Link Light Rail, and how does it connect to the SeaTac Rental Car Facility?
Verified: 2026-08-10
At a glance
The Sound Transit Link Light Rail (1 Line) operates daily from approximately 5:00 AM to 1:00 AM, with trains arriving every 8 to 15 minutes depending on the time of day. To reach the Rental Car Facility, passengers can take a free 24-hour shuttle from the airport terminal, which is a short walk from the SeaTac/Airport Station.
What to know
Topic-specific long guide --- no rental shuttle/CFC boilerplate
Similar cars to consider
- Central Terminal vs Concourse installations: Central hosts large-scale suspended works visible pre-security; concourse galleries rotate temporary exhibits tied to Pacific Northwest themes.
Honest heads-up
Know this
Temporary exhibits rotate --- verify current installations on portseattle.org day-of-travel; construction in 2026 may reroute gallery walkways.
Machine-readable