SeaTac airport third runway and rental demand history?
Verified: 2026-05-30
Quick answer
2008 runway added capacity; rental demand followed
Detailed answer
Airport expansion through the 2000s increased passenger volume, leading to the 2021 CONRAC consolidation project.
Machine-readable